News Flash Home
The original item was published from 6/23/2021 12:52:00 PM to 9/4/2021 12:00:03 AM.

News Flash

Home

Posted on: September 3, 2020

[ARCHIVED] Longs Peak Drive Sewer, Water, and Road Replacement

Longs Peak Drive Improvements Exhibit

Construction for the Longs Peak Drive Improvements project is anticipated to begin in late Summer  2021. The project includes replacing water and sewer lines, and repaving the road. 

The engineers have design 90% complete and the Town plans to put out the bid for construction, anticipating the project to begin in late summer. The most recent design plans are posted here.

In addition, the Town encourages residents to think about possible concerns to their property and to try to get those noted as early as possible in the process. 
Town staff also intends to set up a time to go out on site after collecting comments  and feedback from those residents who are impacted.

The 30% design plans can be found here.

We captured the Q&A from the meeting and the video is posted.

If have questions or you’d like to express possible concerns related to your property, contact Director of Utilities & Engineering Aaron Caplan, at acaplan@townoflyons.com.

Thank you for your continued patience as we rebuild Lyons Strong.

Continue to check back to this page for project updates.

Project Map >>
Facebook Twitter Email

Other News in Home

News 4

What's on Tap Lyons?

Posted on: February 3, 2023
steamboat mtn before storm

Celebrate Winter in Lyons

Posted on: January 20, 2023
Lyons Colorado Logo

Avian Flu in Colorado

Posted on: January 9, 2023
News 4

Grit and Grace in Lyons

Posted on: December 16, 2022